Villa Construction Cost: Turnkey Villas!

9.07.2024

Villa construction costs have increased in 2024, proportional to the rising prices of construction and materials.

Let's examine in our article how much it costs to build a villa in 2024 with updated data!

Happy reading!

Villa Construction Cost

Construction and site costs have increased due to high inflation seen in 2023 and 2024. As a result, the cost of building a house today has also risen.

In addition to building materials, labor costs, vehicle fuel, and many expenses have increased 3-4 times. So, what is included in the cost of building a villa?

Let's examine in the continuation of our article!

Villa Construction Cost List

Villa Construction Cost

Villa construction costs increase daily due to inflation. Additionally, the features of the villa to be built significantly affect these costs. Therefore, it would be incorrect to give an exact price.

However, for those curious, you can check our list containing average data!

  • Project Design 150,000 TL
  • Site Setup 200,000 TL
  • Rough Construction 3,000,000 TL
  • Fine Construction Works 3,500,000 TL
  • Landscaping 200,000 TL
  • Electrical Installation 200,000 TL
  • Mechanical Works 500,000 TL

The table is prepared for a 300 square meter construction area on a 500 square meter plot. Prices may vary.

Elements That Make Up Villa Construction Cost

There are many stages in villa construction, from purchasing the land to installing the utilities. All these stages cause extra costs.

Here are the Stages That Make Up Villa Construction Cost

  1. Project drawing and mapping,
  2. Site setup,
  3. Rough construction works,
  4. Electrical installation,
  5. Plumbing installation,
  6. Landscaping,
  7. Heating and cooling systems arrangement,
  8. Ventilation systems installation,
  9. Public payments,
  10. Transportation and construction machinery,

After all these stages, the villa is completed, and only decoration remains. Let's look at the details and average prices of these stages in our article.

Architectural Project Drawing Fee and Mapping

Villa Construction Cost

The first stage of any project is mapping and project drawing. All of these need to be done by experts.

In addition, after the project drawing stage, a license fee must be paid to the state. Afterwards, certain fees are paid for electricity, water, and natural gas processes.

Project Drawing Process

You need to agree with an architectural office for project drawing. At this stage, pricing varies according to the area you will have built, the detail you want, and the quality of the office.

If we give an approximate price, the price requested for an area of 200 square meters varies between 100,000-150,000 TL. This price includes mapping work.

The corner points of the area where the villa will be built should be determined by a surveying engineer, and the land coordinates should be adjusted accordingly.

Architectural Project Drawing

An architectural project drawing includes; site plans, floor plans, sections. At this point, architects work with homeowners and get their opinions on the stages.

Creation of the Static Project

In static projects, the basic units of the structure are positioned. These projects include; foundation, columns, beams, and floors. Additionally, various engineering calculations are made for safety.

Electrical Installations Project

This is the drawing stage of all electrical installations within the structure. This stage is also very important. Architects and engineers work together at this stage.

All the projects and drawings mentioned here are included in the project fee.

License Fees and Subscription Processes

A certain amount of license payment must be made to the state for the project to be officially presented to the government institution. This payment can vary between 35,000-40,000 TL. As the license and fee amounts are also affected by incoming price increases, there may be changes in pricing.

Subscription processes also require payment of all fees such as electricity, water, and sewage. If these are not paid, they will not be opened for use.

Advanced Rough Delivery - Incomplete

Incomplete is a term frequently used in the construction industry. Here, the rough construction is completed, but not all deficiencies have been addressed.

So, what is included in rough construction?

  1. Roof and walls,
  2. Electricity,
  3. Clean water,
  4. Sewage,
  5. Hot water,
  6. Heating installations,
  7. Window frames,
  8. Steel door,

What Affects Villa Construction Costing?

There are many factors that affect costing in villa construction. At this point, how you choose what is very important.

Factors affecting costing:

  1. Size of the villa,
  2. Quality of materials used,
  3. Location of the construction site,
  4. Ground characteristics of the construction site,
  5. Design features,
  6. Interior and exterior details,
  7. Labor costs,

In our article, we examined the villa construction costs in general terms. You can visit our blog to read more articles about construction and costs.